pile cluster fabrication
Oil & Gas

Pile Cluster Fabrication

  • Fabrication & Construction

Kvaerner awarded the contract to fabricate pile clusters, floatation tanks and conductor guides for the Edvard Grieg and Martin Linge oil rig jackets.

READ MORE

Oil & Gas

SeaRose FPSO

  • Repair & Maintenance

In January 2012, Harland & Wolff was awarded the contract for the drydocking and service of the SeaRose, a floating production, storage and offloading vessel (FPSO).

READ MORE

Renewables

Ormonde Offshore Wind Farm

  • Fabrication & Construction

Belfast based Harland & Wolff signed a contract with leading offshore wind power company Vattenfall for the logistic and assembly services of the Ormonde Offshore Wind Farm.

READ MORE

Cruise & Ferry

HSS Voyager and HSS Explorer

  • Conversion

Harland & Wolff operated within a Framework Agreement with Stena Line for the biennial dry dockings of these complex, high speed craft.

READ MORE

Commercial

MV Anvil Point & MV Eddystone

  • Conversion

Having built and delivered two of these sister vessels in 2003, Harland & Wolff have maintained a close working relationship with Andrew Weir Ltd.

READ MORE

Oil & Gas

Blackford Dolphin Class Renewal Survey

  • Repair & Maintenance
  • Fabrication & Construction

READ MORE

Cruise & Ferry

MV Ulysses, MV Isle of Inishmore, MV Jonathan Swift and MV Normandy

  • Conversion

Regular customer Irish Ferries Ltd docked their vessels annually in Belfast in recent years.

READ MORE

Commercial

MV Aberdeen

  • Conversion

The MV Aberdeen is a North Sea Shuttle Tanker operated by Northern Marine Management on behalf of Stena Offshore.

Oil & Gas

Borgsten Dolphin Docking for Survey Upgrade

  • In Service Support
  • Repair & Maintenance

The Borgsten Dolphin Project was double docked with the Byford in November 2004 for an in-service inspection.

Renewables

Humber Gateway MSF & Jacket

  • Technical Services
  • Fabrication & Construction

Harland & Wolff completed the design and fabrication of a Module Support Frame (MSF) and substation Jacket for E.ON for installation in the Humber Gateway Offshore Windfarm.

Renewables

Robin Rigg Offshore Wind Farm

  • Repair & Maintenance
  • Fabrication & Construction

READ MORE

Oil & Gas

Blackford Dolphin New Accommodation Module

  • Technical Services
  • Fabrication & Construction

A substantial conversion of a ‘cold-stacked’ Aker H3 type semi-submersible being carried out by Dolphin Drilling.

Oil & Gas

Blackford Dolphin New Power Generation Module

  • Conversion

A substantial conversion of a ‘cold-stacked’ Aker H3 type semi-submersible being carried out by Dolphin Drilling in the Keppel Verolme Yard.

Renewables

Bard 1 Transformer Platform and Jacket

  • Fabrication & Construction

Harland & Wolff completed the construction of an offshore wind energy transformer in a joint project.

READ MORE

Oil & Gas

Blackford Dolphin New Buoyancy Steelwork

  • Fabrication & Construction

The Borgsten Dolphin Project was double docked with the Byford in November 2004 for an in-service inspection.

Oil & Gas

Byford Dolphin Docking for Survey Upgrade

  • Repair & Maintenance

READ MORE

Renewables

Scotrenewables SR2000 Tidal Turbine

  • Technical Services
  • Fabrication & Construction

Scotrenewables launch world’s largest tidal turbine.

Oil & Gas

MV Sir Charles Parsons and MV Lord Hinton

  • Conversion

Dry docking and repair of these coal-carrying sister vessels, owned and operated by E.ON.

Renewables

Friedrich Ernestine

  • Conversion

In March 2014 the NSB owned jack-up wind turbine installation vessel Friedrich Ernestine returned to the 335mx50m Belfast Dock at Harland & Wolff ship.

READ MORE